BiD Results Notice

The bid results pertain to projects conducted between 2016 and 2023. For the most up-to-date information on recent bid results, please visit the Opengov platform or explore the Finance webpage under Bids & Contract Opportunities.

Bids & Contact Opportunities

Farmway Water Main Extension Phase 1 (Crossings)

Luby Park Pressure Irrigation System

E. Ustick Road Sewer (Dixie Drain to Florida Avenue) -2nd Bid-

602 Cleveland Parking Lot 

Centennial Way Median Infill

21st Ave Parking Lot Irrigation & Landscaping Improvements

Ustick/Florida and Ustick/Indiana Roundabouts Construction

E. Ustick Road Sewer (Dixie Drain to Florida Avenue)

Pool Facility Rehabilitation

Ustick Road Widening: Lake to I-84

Hwy 20-26 Sewer Trunk Line Extension (Noble Drain to Mason Creek)

Chip Seal Aggregate 2022

Ustick & Santa Ana Roundabout

N. 21st Avenue Parking Lot Project

Brothers Park Irrigation Improvements 

Brothers Park South Parking Lot Expansion 

Kimball & Albany Parking Lot Improvements 2021 

21st Avenue Sewer Lift Station Bypass

North Ranch Road Construction 2020 

North Ranch Sewer Extension 2020 

Cemetery Building 

Lions Park Restroom 

Asbestos Abatement & Demolition - 3905 S. Indiana Avenue

Rodeo Grounds Restroom 

Side Dump Trailers - Street Department 

Downtown Miscellaneous Concrete Improvements 

LID 19-2 Amber Street Sewer Extension 

Indian Creek Pathway Extension to Greenbelt 

LID 19-1 Miscellaneous Concrete 

10th Avenue Railroad Overpass Surface Rehabilitation 

Noble Drain Sewer Extension 2019 

Railroad Parking Lot

Skyway Street Extension 

Local Business Improvement District 17-2: Building Facade Improvements

36-Inch C905 DR51 PVC Pipe

Main Street Rebuild

Smeed Realignment - Concrete Work

Smeed Realignment - Asphalt Paving 

LID 17-1 City Center Core Decorative Improvements

Veterans Hall Elevator Installation -Informal Bid-

Veterans Hall Building Addition (to accommodate elevator) -Informal Bid-

Amiad EBS Filter

Asbestos Abatement & Demolition - 600 Block Main Street

Canyon Hill Lateral 500 Re-Route: 42-Inch C905 DR51 PVC Pipe

Roberts Recreation Building Site Improvements

Asbestos Abatement & Demolition - 1002 Arthur Street

Ustick & Lake Roundabout Concrete Work

Ustick & Lake Roundabout Asphalt Paving 

Ustick & Lake Roundabout Utility Components

Low Line Canal Irrigation Pump Station

Asbestos Abatement & Demolition - 920 Main Street, 117 S. 9th Avenue

LID 16-2 Misc. Concrete

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

Bid Results

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print